mockingbird812
Feb 25th, 05, 1:24 PM
Quick Survey. The topic of earliest LS6 has been covered before. I am curious to know what the LATEST build date is for a 1970 Chevelle LS6. I am assuming they probably built these into July, but would be interested to see what you have or have had.
To get things started, I have a 06E (per cowl tag) build date and a 06-30 (per build sheet) scheduled build date.
Thanks,
Sam
Steve A
Feb 26th, 05, 8:46 PM
Mine's not the last, but it's a late one. Scheduled date was 6-15.
mockingbird812
Feb 27th, 05, 1:33 AM
Steve,
What plant was yr LS6 built at.? What are the particulars of your car? I posted this same question at the Yenko.net site and one fellow mentioned he had a collection of build sheets and one from another plant had a build date in late July. he was able to determine from some paperwork he has that although my 06E cowl tag date would indicate a June build date he was able to determine that my car was actually built in early July. the cowl tag is when the car is started to be assembled.
Sam
Sam
Steve A
Feb 27th, 05, 3:22 PM
LEEDS plant. 06C on the cowl tag. It's black with white stripes, bench seat, auto on the column, 4.10 rear, cowl induction.